Return-to-Play Workflow
An objective, criteria-gated pathway from acute diagnosis to sustained match availability.
- 01 · Triage
Immediate Context & Clear Accountability
Capture diagnosis, imaging, and injury mechanism in one structured intake. Designate the lead practitioner and align the multidisciplinary care team from the moment the injury occurs.
JMJ. MitchellForward · First TeamNew case- Diagnosis
- Hamstring strain · Grade 2
- Mechanism
- High-speed running
- Lead practitioner
- Lead Physio
- Care team
- Physio · S&C · Doctor
- Logged
- Today, 09:14
- 02 · Plan
Criteria-Based Pathways & Defined Exit Gates
Map each phase of the journey with objective exit criteria, testing benchmarks, and target clearance dates. Everyone works from the same clinical standard, removing friction and guesswork from daily progression.
4 phases · Target day 38 - 03 · Deliver
Connected Data & Daily Execution
Medical, performance, and strength staff deliver against the same live criteria. External testing and tracking data sync directly into each gate—eliminating double-entry so staff can focus on the athlete.
Phase 3 criteriaReturn to running3 / 4 met- ✓Hamstring symmetry above 90%VALD
- ✓High-speed running 600mGPS
- ✓Pain-free sprint at 80%Physio
- Load tolerance 7 daysS&C
Data synced automatically · Shared with every discipline - 04 · Forecast
Early Delay Detection & Dynamic Timelines
Return dates continuously recalculate as physical milestones are met or stalled. Flag trajectory drift and bottlenecked criteria weeks before target fixtures, eliminating surprises between the training room and the front office.
Projected return · 14d Delay - 05 · Report
Clear Coach Briefs & Front-Office Alignment
Translate complex clinical and rehabilitation milestones into clear, actionable coaching briefs. Provide clear training limits, minute caps, and projected availability without drowning the room in medical terminology.
Coach brief · Ready to share - 06 · Monitor
Multi-Staff Sign-Off & De-Risking Recurrence
Formalise clearance with required sign-offs across medical, performance, and coaching leadership. Maintain load-exposure guardrails and response tracking through the critical post-return window to de-risk recurrence.
Cleared to playReturned · Day 38Available- ✓Medical signed off
- ✓Performance signed off
- ✓Head Coach signed off
Post-return monitoring active · Full audit trail saved
